Citation: | Adnan Enshassi, Tarik Chatat, Jason von Meding, Giuseppe Forino. Factors Influencing Post-disaster Reconstruction Project Management for Housing Provision in the Gaza Strip, Occupied Palestinian Territories[J]. International Journal of Disaster Risk Science, 2017, 8(4): 402-414. doi: 10.1007/s13753-017-0155-4 |
Anand, P. 2005. Getting infrastructure priorities right in post-conflict reconstruction, Research Paper, UNU-WIDER, United Nations University (UNU). https://www.wider.unu.edu/sites/default/files/rp2005-42.pdf. Accessed 5 Dec 2017.
|
Babbie, E. 1990. Survey research methods, 2nd edn. Belmont, USA:Wadsworth Publishing.
|
Barakat, S. 2009. The failed promise of multi-donor trust funds:Aid financing as an impediment to effective state-building in post-conflict contexts. Policy Studies 30(2):107-126.
|
Barakat, S., and O. Shaban. 2015. Back to Gaza:A new approach to reconstruction. Doha:Brookings Doha Center.
|
Barakat, S., G. Elkahlout, and T. Jacoby. 2004. The reconstruction of housing in Palestine 1993-2000:A case study from the Gaza Strip. Housing Studies 19(2):175-192.
|
Barakat, S., S.A. Zyck, and J.E. Hunt. 2009. The reconstruction of Gaza:A guidance note for Palestinian & international stakeholders. Post-War Reconstruction and Development Unit (PRDU), University of York, UK. https://www.york.ac.uk/media/prdu/documents/publications/pub.%20Reconstructing%20Gaza,%20Barakat%20et%20al%5B1%5D.,%20Jan2009.pdf. Accessed 5 Dec 2017.
|
Bilau, A.A., and E. Witt. 2016. An analysis of issues for the management of post-disaster housing reconstruction. International Journal of Strategic Property Management 20(3):265-276.
|
Bilau, A.A., E. Witt, and I. Lill. 2017. Analysis of measures for managing issues in post-disaster housing reconstruction. Buildings 7(2):29.
|
Chang, Y., S. Wilkinson, R. Potangaroa, and E. Seville. 2010. Resourcing challenges for post-disaster housing reconstruction:A comparative analysis. Building Research & Information 38(3):247-264.
|
Chang, Y., S. Wilkinson, R. Potangaroa, and E. Seville. 2011. Identifying factors affecting resource availability for post-disaster reconstruction:A case study in China. Construction Management and Economics 29(1):37-48.
|
Chang, Y., S. Wilkinson, R. Potangaroa, and E. Seville. 2012. Managing resources in disaster recovery projects. Engineering, Construction and Architectural Management 19(5):557-580.
|
Chang-Richards, Y., R. Rapp, S. Wilkinson, J. von Meding, and R. Haigh. 2017. Disaster recovery project management:A critical service. International Journal of Project Management 35(5):783-787.
|
Davidson, C.H., C. Johnson, G. Lizarralde, N. Dikmen, and A. Sliwinski. 2007. Truths and myths about community participation in post-disaster housing projects. Habitat International 31(1):100-115.
|
Enshassi, A., and M.A. Zaiter. 2013. Self-help approach in housing reconstruction and beneficiaries satisfaction in Palestine. In Proceedings of the international symposium on new technologies for urban safety of mega cities in Asia, 9-11 October 2013, Hanoi, Vietnam.
|
Enshassi, A., A.R. Abdul-Aziz, and S. Abushaban. 2011. Performance of construction projects:Perception of owners in Palestine. Emirates Journal for Engineering Research 16(1):23-32.
|
Enshassi, A., J. Al-Najjar, and M. Kumaraswamy. 2009. Delays and cost overruns in the construction projects in the Gaza Strip. Journal of Financial Management of Property and Construction 14(2):126-151.
|
Enshassi, A., F. El Shorafa, and S. Alkilani. 2015. Assessment of operational maintenance in public hospitals buildings in the Gaza Strip. International Journal of Sustainable Construction Engineering & Technology 6(1):29-43.
|
Enshassi, A., S. Mohamed, and M. Abdel-Hadi. 2013. Factors affecting the accuracy of pre-tender cost estimates in the Gaza Strip. Construction in Developing Countries 18(1):73-94.
|
Enshassi, A., S. Mohamed, Z.A. Mustafa, and P.E. Mayer. 2007. Factors affecting labour productivity in building projects in the Gaza Strip. Journal of Civil Engineering and Management 13(4):245-254.
|
Fengler, W., A. Ihsan, and K. Kaiser. 2008. Managing post-disaster reconstruction finance-International experience in public financial management. World Bank Publications. Washington DC:World Bank.
|
Fink, A. 2003. The survey handbook. London:Sage Publications.
|
Geraldi, J.G., J.R. Turner, H. Maylor, A. Söderholm, M. Hobday, and T. Brady. 2008. Innovation in project management:Voices of researchers. International Journal of Project Management 26(5):586-589.
|
Harvey, P. 2005. Cash and vouchers in emergencies. Humanitarian policy group discussion paper. London:Overseas Development Institute.
|
Hidayat, B., and C. Egbu. 2010. A literature review of the role of project management in post-disaster reconstruction. In Proceedings of the 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, ed. C. Egbu, 1269-1278. UK Association of Researchers in Construction Management. http://usir.salford.ac.uk/10144/1/ar2010-1269-1278_Hidayat_and_Egbu.pdf. Accessed 5 Dec 2017.
|
Holt, G.D. 2014. Asking questions, analysing answers:Relative importance revisited. Construction Innovation 14(1):2-16.
|
IFRC (International Federation of Red Cross and Red Crescent Societies). 2012. Post-disaster community infrastructure rehabilitation and (re)construction guidelines. Geneva:IFRC.
|
Ismail, D., T.A. Majid, R. Roosli, and N. Ab Samah. 2014. Project management success for post-disaster reconstruction projects:International NGOs perspectives. Procedia Economics and Finance 18:120-127.
|
Jha, A.K., J. Duyne Barenstein, P.M. Phelps, D. Pittet, and S. Sena. 2010. Safer homes, stronger communities:A handbook for reconstructing after natural disasters. World Bank Publications. Washington DC:World Bank.
|
Johns, R. 2010. Likert items and scales. Survey question bank:Methods fact sheet, March 2010. https://www.sheffield.ac.uk/polopoly_fs/1.597637!/file/likertfactsheet.pdf. Accessed 5 Dec 2017.
|
Kaklauskas, A., D. Amaratunga, and R. Haigh. 2009. Knowledge model for post-disaster management. International Journal of Strategic Property Management 13(2):117-128.
|
Karunasena, G., and R. Rameezdeen. 2010. Post-disaster housing reconstruction:Comparative study of donor vs owner-driven approaches. International Journal of Disaster Resilience in the Built Environment 1(2):173-191.
|
Kusumasari, B., Q. Alam, and K. Siddiqui. 2010. Resource capability for local government in managing disaster. Disaster Prevention and Management:An International Journal 19(4):438-451.
|
Le, K.N., and V.W.Y. Tam. 2007. A survey on effective assessment methods to enhance student learning. Australasian Journal of Engineering Education 13(2):13-20.
|
Lizarralde, G., C. Johnson, and C. Davidson. 2009. Rebuilding after disasters:From emergency to sustainability. Abingdon, UK:Routledge.
|
Meyers, B. 1991. Disaster study of war. Disasters 15(4):318-330.
|
Moe, T.L., and P. Pathranarakul. 2006. An integrated approach to natural disaster management:Public project management and its critical success factors. Disaster Prevention and Management:An International Journal 15(3):396-413.
|
Ophiyandri, T., D. Amaratunga, C. Pathirage, and K. Keraminiyage. 2013. Critical success factors for community-based post-disaster housing reconstruction projects in the pre-construction stage in Indonesia. International Journal of Disaster Resilience in the Built Environment 4(2):236-249.
|
Packendorff, J. 1995. Inquiring into the temporary organization:New directions for project management research. Scandinavian Journal of Management 11(4):319-333.
|
Pathirage, C., R. Haigh, D. Amaratunga, and D. Baldry. 2008. Knowledge management practices in facilities organisations:A case study. Journal of Facilities Management 6(1):5-22.
|
Project Management Institute. 1987. Project management body of knowledge (PMBOK). Newtown Square, PA:Project Management Institute.
|
Project Management Institute. 2005. Project management methodology for post disaster reconstruction. Newtown Square, PA:Project Management Institute.
|
Qarmout, T., and D. Béland. 2012. The politics of international aid to the Gaza Strip. Journal of Palestine Studies 41(4):32-47.
|
Sakalasuriya, M.M., R.P. Haigh, and D. Amaratunga. 2016. The consequences of post conflict reconstruction:A review of literature. In Proceedings of the 12th International Conference of the International Institute for Infrastructure Resilience and Reconstruction, 5-7 August 2016, University of Peradeniya, Kandy, Sri Lanka, 153-159. http://eprints.hud.ac.uk/id/eprint/29256/1/Maheshika.pdf. Accessed 5 Dec 2017.
|
Schiavo-Campo, S. 2003. Financing and aid management arrangements in post-conflict situations. CPR Working Papers. Social Development Department, Environmentally and Socially Sustainable Development Network. http://documents.worldbank.org/curated/en/967011468777577384/pdf/266890Conflict0prevention0wp0no-06.pdf. Accessed 5 December 2017.
|
Seneviratne, K., D. Amaratunga, and R. Haigh. 2016. Managing housing needs in post conflict housing reconstruction in Sri Lanka:Gaps verses recommendations. International Journal of Strategic Property Management 20(1):88-100.
|
Seneviratne, K., D. Amaratunga, and R.P. Haigh. 2017. Managing housing needs of post conflict housing reconstruction:Sri Lankan perspective. Engineering Construction and Architectural Management 24(2):275-288.
|
Singh, B., and S. Wilkinson. 2008. Post-disaster resource availability following a Wellington earthquake:Aggregates, concrete and cement. In Proceedings of the 4th International i-Rec Conference on Building Resilience:Achieving Effective Post-Disaster Reconstruction, 3 April-2 May 2008, University of Canterbury, New Zealand. http://www.irbnet.de/daten/iconda/CIB11583.pdf. Accessed 5 Dec 2017.
|
Teeuw, R.M., M. Leidig, C. Saunders, and N. Morris. 2013. Free or low-cost geoinformatics for disaster management:Uses and availability issues. Environmental Hazards 12(2):112-131.
|
UNDP (United Nations Development Programme). 2014. Detailed infrastructure damage assessment:Gaza-2014. Jerusalem:UNDP.
|
UNEP (United Nations Environment Programme). 2009. Environmental Assessment of the Gaza Strip:Following the escalation of hostilities in December 2008-January 2009. Nairobi, Kenya:UNEP.
|
UNISDR (United Nations International Strategy for Disaster Reduction). 2009. UNISDR terminology on disaster risk reduction. Geneva, Switzerland:UNISDR.
|
von Meding, J., L. Oyedele, and J. Bruen. 2014. Linking organisational competency to project success in post-disaster reconstruction. Open House International 39(3):7-16.
|
von Meding, J., J. Wong, S. Kanjanabootra, and M. Taheri Tafti. 2016. Competence-based system development for post-disaster project management. Disaster Prevention and Management 25(3):375-394.
|